Your cart is empty.
Browse the store →
Every month the heat exchanger efficiencies dropped dramatically because of an increase in pressure between inlet and outlet of the heat exchanger. Vulcan S250 models were installed and after 5 months there have not been any mineral scale pressure issues in the cooling towers or heat exchangers.

Model: Vulcan S250
Location: Beersheba (Israel)
Installation Area: 4 cooling towers, each with 2 heat exchangers
Period: 5 month observation

The Be'er Sheva Grand Mall is the largest shopping mall (220 stores) in the southern region of Israel, located in Be'er Sheva - the capital of the Negev.
The Vulcan S250 descaler is installed on the roof of the shopping mall in a waterproof box. After wrapping the impulse bands around the pipes another outdoor weather protective insulation was wrapped around the impulse bands for long-term weather protection. During the 5-month testing period, the outdoor ambient temperature was 38 - 40 °C.
The shopping mall management team was so impressed with the results of this test that additional mineral descalers will be installed in the rest of the company’s facilities.

With Vulcan: The pressure difference is lower between the exit and the inlet of the heat exchanger.
With Vulcan: The water coming out of the heat exchanger is colder.

Waslix gathers, organizes, and researches a massive range of products across water, light, air, and energy. We demystify complex technologies to simplify your high-involvement purchasing decisions, making complete solutions easily accessible.
Edit this HTML block.